Creating Belgium’s high-voltage highway for the future

Lamifil supplied 260 km of AAAC UHC (Ultra-High Conductivity) overhead conductors for a vital and unique backbone upgrade of Belgium’s national grid. Belgium’s national grid operator Elia is continuously developing its high-voltage grid system or ‘backbone’ to support the energy transition and increase interconnectivity within the European grid network. One of the key high-voltage development […]

Lamifil to supply 700 km of ACCC® Conductor to reinforce Dutch high voltage backbone

“Beter Benutten Bestaande 380kV net” (Making Better Use of the Existing 380kV grid) is an ambitious project initiated by transmission system operator TenneT in 2019 to significantly scale up the capacity of the Dutch high voltage grid. Not by building new lines, but by replacing existing conductors with next-generation HTLS (High Temperature Low Sag) conductors. […]

Securing Power Supply for Transpower’s Auckland and Northland Grid

In order to meet the future power supply needs of New Zealand’s Auckland and Northland regions, a vital part of the 220 kV Otahuhu–Whakamaru A and B transmission lines needed to be replaced. After 68 years of service, the conductor of the Otara to Flatbush section had reached its end of life.  National grid owner […]

Connecting the future of efficient power in Northwest Scotland

Lamifil delivers high-tech ACCC® Conductor for award-winning reconductoring project First commissioned over 70 years ago, you could say a lot has changed since the original high-voltage overhead transmission line was installed between Scotland’s Fort Augustus and Fort William. Marked growth in both the local manufacturing and renewable energy sectors has resulted not only in increased […]

SCE selects Lamifil’s ACCC® Zadar for congested Victor-Hesperia corridor

As part of the Victor-Acqueduct project, Southern California Edison (SCE) upgraded 18km of overhead line in a heavily congested corridor located in the Northeast of the city of Los Angeles. Due to the challenging nature of the location, SCE selected Lamifil’s high-quality and technologically advanced ACCC® Zadar conductor. Increasing line capacity in a challenging location […]

Lamifil Catenary Wires Revive Iconic La Mure Railway Line in the French Alps

Built between 1880 and 1884, the La Mure railway line is situated in the French Alps of the Isère Department. It was originally used to transport coal from the local mines to the valley. After decades of service as a tourist train, La Mure line was interrupted in 2010 due to a massive landslide. As […]

ACCC ICE+ conductor

Kent relies on Lamifil ACCC® ICE+ conductors for increased power capacity

The 400kV overhead line that runs between Littlebrook and Kemsley in Kent, UK has been in operation since 1962. And with demand expected to rise over the coming decades, National Grid recently launched a full-scale refurbishment of the line to secure the reliability of supply and anticipate future growth. The EPC contractor Babcock International ultimately […]